NRM 1 - Order of Cost Estimating and Cost Planning for Capital Building Works: NRM 1 (New Rules of Measurement)

£9.9
FREE Shipping

NRM 1 - Order of Cost Estimating and Cost Planning for Capital Building Works: NRM 1 (New Rules of Measurement)

NRM 1 - Order of Cost Estimating and Cost Planning for Capital Building Works: NRM 1 (New Rules of Measurement)

RRP: £99
Price: £9.9
£9.9 FREE Shipping

In stock

We accept the following payment methods

Description

Even the token developer was supportive, if only because it allowed him to ask what his QSs really do to justify their fee.

begin addressing a common standard for life cycle cost planning and procurement of capital building works, and the life cycle of replacement and maintenance works. Read more about the condition New: A new, unread, unused book in perfect condition with no missing or damaged pages. NRM 1 forms part of the RICS suite of publications referred to as the ‘new rules of measurement (NRM)’.

The New Rules of Measurements (NRM) for Capital and Building Works, published by the Royal Institution of Chartered Surveyors is part of the suite of documents that make up the RICS New Rules of Measurement. As such we’re aware of organizations elsewhere having prepared their own translations of classification headings, though of course the codes themselves remain consistent wherever you are. As Head of Quality Management at Gleeds, international management and construction consultants, David focuses on service improvement for all aspects of quantity surveying and project management activities – with a worldwide remit. It seemed that Nirvana was being revealed to us; a new world of accurate cost estimates, clear and transparent cost data and measurable whole life value. The first edition was published in February 2009, but several factors combined to make it necessary to publish a second edition in January 2013 which is still the most recent addition today.

After the Foreword the NRM2 opens up with a General section, that outlines the big picture of the RICS New Rules of Measurement Suite and how NRM2 fits into the whole NRM project; that is estimating and cost planning through to whole life costs. This book is essential reading for anyone working with NRM1, and is the most authoritative guide to practice available for those preparing to join the industry. Unlike its predecessor SMM7, NRM2 contains a lengthy section describing the purpose and benefits of bills of quantities in rather a text book like approach. There are other classification schemes and related systems in use in the global construction industry, and sometimes it’s necessary to use more than one for specific purposes in a project. The primary development in recent years has been the publication of the International Cost Management Standard (ICMS) (formerly known as International Construction Measurement Standards).The following worked example base date is the second quarter of 2020 (2Q20) with no allowance for tender inflation, construction inflation or value-added tax (VAT). NRM3 also offers guidance about the measurement of other items associated with maintenance works that are not included in work items.

The RICS new rules of measurement are based on UK practice but the requirements for a coordinated set of rules and underlying philosophy behind each section have worldwide application. Direction on how to quantify other items forming part of the cost of a construction project, that many may not thinkabout is also provided such as: preliminaries, overheads and profit, project team and design team fees, risk allowances, inflation, and other development and project costs. These translations have not been published by NBS as part of Uniclass, but if you have prepared a translation or are interested in doing so, we would be happy to hear from you. Most purchases from business sellers are protected by the Consumer Contract Regulations 2013 which give you the right to cancel the purchase within 14 days after the day you receive the item.The cost management of a building project is the joint responsibility of the whole project team; not the cost manager alone. Part 1 contextualises approximate estimating and cost planning in terms of the RIBA and OGC process models and also explains certain symbols and abbreviations.



  • Fruugo ID: 258392218-563234582
  • EAN: 764486781913
  • Sold by: Fruugo

Delivery & Returns

Fruugo

Address: UK
All products: Visit Fruugo Shop